Installation Instructions
General Installation Instructions - All Models
Secure the HydroFLOW unit firmly to the pipe using ties provided.
The ties are installed through the slots incorporated in the lower section
of both end caps, passed around the pipe end secured, (see illustration
below). Warning: the ties are non-removable, so do not attempt to connect
them until installation is required.
Fit hexagon nuts into the holes provided in the end plate, next to the
ferrite retaining cage, (see illustration below). Where the installation is
on a vertical pipe, it is recommended that the unit is fitted with ferrite
cage uppermost to ease fitting of hexagon nuts.
Insert a long ferrite bar through aperture in retaining cage until both
holes line up with the two hexagon nuts in the end plate (see illustration
below).
Take second ferrite and line up with hole in ferrite through retaining cage,
insert plastic bolt through both ferrite bars and tighten into hexagon nut.
Assemble other ferrite's around pipe (see illustration below) and secure
with plastic nuts and bolts, making the final connection into the hexagon
nut on the other side of the ferrite cage. Tighten all nuts and bolts until
hand tight, do not over-tighten.
Install Power Supply Unit (P.S.U.) in a convenient position adjacent to the
mains electric (90V-260V) supply point, so that the LEDs can be easily
viewed. A special extension cable can be obtained from the supplier if
required.
Connect to mains (see IEE wiring instructions). Switch on mains supply and
ensure that the red and green L.E.D.s are glowing brightly on the P.S.U.
WARNING: FERRITE IS BRITTLE AND WILL BREAK IF SUBJECTED TO SUDDEN IMPACT
|
|
Typical Contents
- 1 Transducer
- 1 Power Supply Unit
- 1 Long ferrite
- 3 Short ferrite
- 1 double end cable
- 1 single end cable
- 2 plastic hexagon nuts
- 4 Thumb-bolts
- 2 Thumb-nuts
- Ties
Installation Instructions Contents varies according to model. |
|